S&A Project: Business Generator Installation in the Free State

Yet another highly successful S&A Generators project took place between 14 and 19 October 2019, when we partnered with Diesel-Electric once more to deliver exceptional power-generation services to a client situated in Phuthaditjhaba, Free State. This business generator installation required us to travel cross-country from KwaZulu-Natal, and deploy our trusty S&A Generators crane truck once again. Three S&A Generators team members worked on this job. Below we detail what our client’s problem was, the solution we were able to put in place for them, and the steps we took in the process:

The Problem

It is a problem faced by businesses and households across South Africa, and it doesn’t seem to have an end in sight. We’re talking about load shedding, which drove our client to seek the assistance of generator specialists. His business was suffering due to constant power cuts, which led to losses in both business and subsequently cash flow. The client approached Diesel-Electric, who then contacted us, for a quote on a brand new generator that could power his business when the lights went off.

business generator installation - removing the generator from the truck

Our client’s new generator being delivered to site by our trusty S&A Generators crane truck.

The Solution

S&A Generators assessed the situation, and provided a competitive quotation that included both the cost of a new generator and the cost of the business generator installation. Once the client had accepted our quotation, we sprung into action by ordering the new generator and preparing our team members for the task at hand. S&A Generators staff members involved with this project were Roger Smith (one of our technicians who oversaw the project), Velani Gumede (an assistant who was vital during the installation process), and Siphelele (our talented electrician who was involved with hooking up the generator).

business generator installation - the new generator in position

The new generator in position and awaiting wiring to connect it to the client’s power system.

Once we had the new generator and everything was good to go, we set off from our HQ in Hillcrest, KwaZulu-Natal, and travelled across the border to the neighbouring Free State province. Upon arrival, we ascertained where the best place would be for the business generator installation to take place, and constructed a plinth and bund from scratch.

An image respresenting S&A Project: Business Generator Installation in the Free State

S&A Generators team members starting to construct the plinth and bund wall where the generator was to be installed.

Once the plinth and bund wall was completed, and given enough time to set, the next phase was bringing in the S&A Generators crane truck and carefully lowering the new generator into position. This takes a high level of accuracy, and we had our team members close by to guide the generator until it came to its final resting place.

An image respresenting S&A Project: Business Generator Installation in the Free State

Our crane truck lowering the new generator into position upon the plinth.

Finally, all that was left to do on this business generator installation was to run electrical wires from the new generator to the client’s DB board. This in itself is half of the challenge, but our talented electrician Siphelele was up to it. Once everything was connected and tested, we built fencing around the unit to secure it and constructed a small awning to protect the generator from the weather. This was all in all a very successful project that left our client highly satisfied with the result.

Manuals

Download our Manuals for any specific installation or generator specs

An image respresenting First-Time Buyers' Guide For Generators

First-Time Buyers’ Guide For Generators

With the ongoing challenges of load shedding in South Africa, many business owners are considering...
An image respresenting GENERATOR PLACEMENT GUIDELINES FOR DIESEL AND PETROL UNITS

GENERATOR PLACEMENT GUIDELINES FOR DIESEL AND PETROL UNITS

In South Africa, resilience is key, especially with Eskom's unpredictable load shedding. Finding...
An image respresenting How Important Are Generators For The Industrial Sector?

How Important Are Generators For The Industrial Sector?

South Africa's industrial sector is the backbone of the nation's economy, driving growth and...
An image respresenting 8 Signs You Need A Diesel Generator Mechanic

8 Signs You Need A Diesel Generator Mechanic

Like all internal combustion engines, there’s a lot that can go wrong with a diesel generator’s...
An image respresenting Will load shedding still be an issue through 2022?

Will load shedding still be an issue through 2022?

For over 14 years South Africans have contended with intermittent and often short-notice power...
An image respresenting Why Generators Are Basically Portable Power Stations

Why Generators Are Basically Portable Power Stations

Power stations are those little brick buildings with steel doors you see at the entrance to any...
An image respresenting Can You Fill A Generator While It’s Running?

Can You Fill A Generator While It’s Running?

Backup diesel or petrol generators come in many shapes and sizes, but one common thread that runs...
An image respresenting S&A Project: Generator Relocation from Hilton to Wartburg, KZN

S&A Project: Generator Relocation from Hilton to Wartburg, KZN

We recently took on a generator relocation project for a client based in Hilton, KwaZulu-Natal. He...

Recent Posts